CHIMI FLUX Powder
ZnCl₂·2NH₄Cl
Zinc Ammonium Chloride powder for high-speed galvanizing. Features low fuming, negligible ash, and produces thin, uniform zinc coats on metal surfaces.
Product Overview
Zinc Ammonium Chloride powder for high-speed galvanizing. Features low fuming, negligible ash, and produces thin, uniform zinc coats on metal surfaces.
Technical Specifications
- Chemical Formula
- ZnCl₂·2NH₄Cl
- Appearance
- White crystalline powder
- Concentration
- High-speed galvanizing grade
- Solubility
- Water soluble
- Available Packaging
- 25kg bags · 50kg bags
- Shelf Life
- 24 months
- Storage Conditions
- Dry, moisture-free
| Property | Value |
|---|---|
| Chemical Formula | ZnCl₂·2NH₄Cl |
| Appearance | White crystalline powder |
| Concentration | High-speed galvanizing grade |
| Solubility | Water soluble |
| Available Packaging | 25kg bags · 50kg bags |
| Shelf Life | 24 months |
| Storage Conditions | Dry, moisture-free |
Technical Documents
Applications
Dosing Guidelines
Bath concentration: 200-400 g/L. Operating temperature: 60-80°C. Immersion time: 1-3 minutes depending on surface condition.
How It Works
Zinc Ammonium Chloride dissolves surface oxides and deposits a thin protective flux film that prevents re-oxidation before galvanizing dip.
Usage Tips
Low fuming with negligible ash content. Ensures thin, uniform zinc coats. Monitor bath iron content regularly.
Frequently Asked Questions
What are the main applications for CHIMIFLUXPowder?▼
What are the main applications for CHIMIFLUXPowder?▼
What are the main applications for CHIMIFLUXPowder?▼
What are the main applications for CHIMIFLUXPowder?▼
What are the main applications for CHIMIFLUXPowder?▼
Certifications & Compliance
Related Products in This Family
Frequently Asked Questions
CHIMIFLUXPowder is designed for specific industrial chemical applications. Our technical team can provide detailed application guidance, dosing recommendations, and compatibility information for your specific requirements.
Need a Custom Solution?
Request a quote, discuss your specifications, or schedule a facility visit. Our technical team responds within 24 hours.