ART NOCOR 532
Filming amine corrosion inhibitor for petrochemical applications. Protects toppings, vacuum towers, de-propanizers, de-butanizers, H2S strippers, and steam cracking units.
Product Overview
Filming amine corrosion inhibitor for petrochemical applications. Protects toppings, vacuum towers, de-propanizers, de-butanizers, H2S strippers, and steam cracking units.
Technical Specifications
- Appearance
- Amber liquid
- Concentration
- Filming amine blend
- pH Range
- 7.0-9.0
- Solubility
- Oil soluble
- Available Packaging
- 200L drums · 1000L IBC
- Shelf Life
- 18 months
- Storage Conditions
- Cool, dry place
| Property | Value |
|---|---|
| Appearance | Amber liquid |
| Concentration | Filming amine blend |
| pH Range | 7.0-9.0 |
| Solubility | Oil soluble |
| Available Packaging | 200L drums · 1000L IBC |
| Shelf Life | 18 months |
| Storage Conditions | Cool, dry place |
Technical Documents
Applications
Dosing Guidelines
Continuous injection into overhead systems. Dosing rate based on crude throughput and chloride content. Monitor overhead water pH.
How It Works
Filming amine forms a protective molecular barrier on metal surfaces in overhead condensation equipment, preventing acid corrosion from HCl and H₂S.
Usage Tips
For petrochemical use: toppings, vacuum towers, de-propanizers, de-butanizers, H₂S strippers, steam cracking units. Monitor corrosion coupons.
Frequently Asked Questions
What are the main applications for ARTNOCOR532?▼
What are the main applications for ARTNOCOR532?▼
What are the main applications for ARTNOCOR532?▼
What are the main applications for ARTNOCOR532?▼
What are the main applications for ARTNOCOR532?▼
Certifications & Compliance
Related Products in This Family
Frequently Asked Questions
ARTNOCOR532 is designed for specific industrial chemical applications. Our technical team can provide detailed application guidance, dosing recommendations, and compatibility information for your specific requirements.
Need a Custom Solution?
Request a quote, discuss your specifications, or schedule a facility visit. Our technical team responds within 24 hours.